Pool Under Construction
Construction Photo Gallery Page Five
The automatic cover is installed and tested.
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
Next
The low profile track for the automatic cover runs along the edge of the pool and will be securely attached to the concrete deck.
Doug screws a section of the low profile track into the concrete pool deck.
The motor and pulley system have now been bolted in position in the box.
The opposite end of the auto cover box where the main tube is supported by a heavy duty metal bracket.
The cover is laid out next to the box in preparation for attaching the ropes and winding the cover around the main tube.
A worker attaches the ropes around the pulley at the end of the low profile track.
The ropes are attached to the pulley system and the corner of the cover.
Doug and a worker install the auto cover's top track.
A close up of the top track of the auto cover.
Next, the operation of the automatic cover is tested and the rope tension is adjusted.
Brackets are installed that will help suport the auto cover lid.
The auto cover's lid is assembled.
Top
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
Next